Moving Office
Sep. 21st, 2006 09:00 pmWell, We are moving office.
Tommorow the removalists arrive and take out 18 years of accumulated equipment and stuff.. most of the junk has been junked already.
Between our two office buildings (wqhich are owned by different people) we have a fibre optic cable. This cable needs to be cut.
What way should I cut the cable
1) Large bag of Thermite
2) Hacksaw
3) Hachet
4) Pliers
5) Brute force ripping
6) hammer
7) leave it in place for the demolition crew to pull out.
8) Other suggestion..
I should point out that thisd link HAS to come out and that if its not be doing it it will be sombody else doing it.. I should also point out that it cost $10,000 to put it into the building originially..
Tommorow the removalists arrive and take out 18 years of accumulated equipment and stuff.. most of the junk has been junked already.
Between our two office buildings (wqhich are owned by different people) we have a fibre optic cable. This cable needs to be cut.
What way should I cut the cable
1) Large bag of Thermite
2) Hacksaw
3) Hachet
4) Pliers
5) Brute force ripping
6) hammer
7) leave it in place for the demolition crew to pull out.
8) Other suggestion..
I should point out that thisd link HAS to come out and that if its not be doing it it will be sombody else doing it.. I should also point out that it cost $10,000 to put it into the building originially..